Voith Delivers Complete Electromechanical Equipment for Hydropower Plant Extension Project in Pakistan

22.03.2018

In the presence of numerous guests from the areas of politics, industry, and society, Shahid Khaqan Abbasi, the Prime Minister of Pakistan, inaugurated the first of three new machine units at the Tarbela hydropower plant on March 10, 2018.

Voith Delivers Complete Electromechanical Equipment for Hydropower Plant Extension Project in Pakistan

Voith is a key partner for this project and is supplying, installing and commissioning the entire electromechanical equipment, valued at around 200 million Euro. The customer for the project, financed by the World Bank, is the Water and Power Development Authority (WAPDA) of Pakistan. The project represents another important milestone for Voith in the Asian hydropower market.

Around 40 percent more power through Voith technology

The fourth expansion of the Tarbela hydropower plant raises the output of this plant, located in northern Pakistan, to a total of 4,888 megawatts. This represents a capacity increase of around 40 percent. For the expansion of the power plant – first inaugurated in 1974 – Voith has supplied three generators, three Francis turbines with an output of 470 megawatts each, automation systems, overhead 500-kilovolt transmission lines and the entire electromechanical power plant equipment. It is planned to have all three machine units providing power into the Pakistan energy grid by the end of May 2018.

Largest main inlet valve in the world

Part of the Voith order also included the design, production, delivery, and installation of three main inlet valves, which are installed between the pressure pipeline and the turbines in order to stop the flow of water in case of emergency and for maintenance work on the units. With a diameter of 7.5 meters and a total weight of around 750 tons each, they are regarded as the world’s largest main inlet butterfly valves of their kind with double seals. The experts at the research and development center of Voith Hydro in Germany and China jointly developed the valve based on their global references. The valves were completely produced at Voith Hydro Shanghai, China.

Voith’s global foot-print pays off

The Voith locations in Heidenheim, Germany and Shanghai, China have worked in close collaboration during the period of this complex and large-scale project. Voith Hydro Shanghai produced the Francis turbines, generators, main inlet valves, overhead 500-kilovolt transmission line and mechanical plant equipment, whilst Voith Hydro in Germany supplied the electrical equipment and the automation systems.

“Due to the size and complexity of this important project for Pakistan, there was a need for close cooperation and constant communication with all involved parties. This included the end customer WAPDA, the customer engineering consultant as well as other Chinese subcontractors at the site,” explains Uwe Wehnhardt, CEO of Voith Hydro and Member of the Corporate Board of Management. “Our global development and production foot-print and deep experience of working closely with Chinese EPC contractors definitely paid off for this.”

Hydropower plant premiere for the OnCare AM asset management solution

The integration of Voith’s OnCare AM in the Tarbela IV power plant is the world s first. The system, which was originally developed for paper machines, is used for planning all maintenance processes in the power plant. The system compares the key output figures, reads the stored data and reacts to any discrepancies. In this way, the customer is able to identify potential optimizations and plan preventive maintenance measures, thereby allowing the operator to greatly reduce unplanned downtimes and increase the availability of its plant. Thanks to the use of OnCare AM, Tarbela IV is regarded as an example of intelligent hydropower plants and a pioneer for other plants around the world.

Bild: Pakistani Prime Minister Shahid Khaqan Abbasi (left) thanked Stephen Lewis (right), President of Voith Hydro China for the successful project execution. In the middle of the picture: Lt. General (Rd) Muzzammil Hussain, Chairman of the Water and Power Development Authority (WAPDA) of Pakistan (Image: Voith)

More articles on this topic

Voith Equips 2 GW Hydropower Plant in Angola

22.12.2023 -

Technology group Voith is set to supply equipment for the large-scale hydropower plant Caculo Cabaça in Angola, West Africa. The order comprises all electrical and mechanical equipment, including the installation of four Francis turbines with an output of 530 MW each, an additional Francis turbine with an output of 52 MW, generators, control and auxiliary systems and a customized training concept.

Read more