BBA Pumps Supplies Lock Complex with a Unique Temporary Pumping Installation

19.03.2018

The Theodorushaven is a port and industrial area located to the west of the town of Bergen op Zoom.

BBA Pumps Supplies Lock Complex with a Unique Temporary Pumping Installation

BBA Pumps

Thanks to the Burgemeester Peterssluis (lock), there is a direct connection with the Scheldt-Rhine Canal, allowing vessels with draughts of up to 4.5 meters to reach the port.

The challenge

When the following conditions come together: persistent heavy rain, wind from the wrong direction and spring tide, the gates are closed on both sides of the lock to guarantee safety in the port area.

Once the lock gates are closed, a temporary pumping installation mounted on a pontoon maintains the water level within the harbor area. The greatest challenge is then to manage the difference between high and low tide, which could be as much as 75 cm.

The solution

BBA Pumps has recently delivered a unique pumping system which takes care of the water level difference by means of a flexible construction at the discharge side. The discharge connection of the 20" high volume pump - type BA500G - is vertically installed. On top of this, a galvanized manifold for 3 x 12-inch bends including a work platform are incorporated.

As soon as the pontoon with the pump docks in front of the lock gate, 8-meter long rubber discharge hoses are connected to a manifold on the quay. This ensures enough flexibility to absorb the water level difference while pumping. The discharge pipe - which runs to the end of the lock - consists of a non-return valve, a manual shut-off valve and about 150 meters of steel flange pipes with a diameter of 600 mm.

The result

In consultation with the customer - the Brabantse Delta Water Board - the BBA Pumps team scheduled an official SAT (Site Acceptance Test), which was conducted mid-February. During the day, the steel pipes were laid parallel to the lock and at just a short distance away in the harbor, the pump set as well as its external fuel tank were placed onto the pontoon. In order to minimize any inconvenience caused by (water) traffic, the lock was closed at night so that the pump could be connected to the piping and the test could be completed successfully.

"It was a really special project for us. The BBA Pumps innovation team had planned the entire system, calculated it and took care of all the necessary drawings. Nevertheless, it is still rather nerve wracking to have just a few hours to connect and test the installation at such an immense lock complex", said Henno Schothorst, Product & Marketing manager at BBA Pumps.

More articles on this topic

Xylem Wins for “Net Zero” Leadership at Global Water Awards

25.05.2022 -

Global water technology leader Xylem was named “Net Zero Carbon Champion” at the 2022 Global Water Awards, recognizing the Company’s work to accelerate the decarbonization of the water sector. In addition to its own commitments to achieve net-zero carbon emissions, Xylem is partnering with utilities, businesses and water managers around the world to help reduce their carbon footprint.

Read more

Xylem Celebrates 5 Million Flygt Pumps

30.03.2022 -

Xylem this week celebrates the production of five million Flygt pumps, continuing its 100-year record of breakthrough water technology innovations. A Flygt Concertor, the world’s first wastewater pumping system with integrated digital intelligence, was the five millionth pump to roll off the production line and will serve the UK-based water utility, Scottish Water.

Read more