IN FOCUS

LATEST NEWS - Contracts + Case Stories

  • Voith Hydro Canada Awarded Site C Turbine and Generator Contract

    04.05.2016 -

    Voith Hydro Canada has received a 470 million Canadian Dollar (CAD) turbine and generator contract from energy supplier and future plant operator BC Hydro. The contract is for the design, supply, and installation of six vertical axis, Francis-style turbines, six generators and associated equipment, and covers work to be completed at the Site C Clean Energy Project (Site C) on the Peace River in northeast British Columbia (BC).

    Read more

    Dewatering Solutions by Sulzer Reduce Costs for Boliden Garpenberg in Hedemora, Sweden

    03.05.2016 -

    Boliden Garpenberg, which mines a complex ore containing zinc, lead, copper, silver and gold, is one of the world’s most highly modernized mines. Productivity per employee is almost unequalled, and economy at the mine is always in focus. This is true even when it comes to the constant task of removing sludge and water. Since 2007, the mine has relied on Sulzer to care for its entire fleet of pumps – including those of previous suppliers – and has been among the first to adopt Sulzer dewatering innovations.

    Read more

    Amarinth Secures Order to Equip the Pioneiro de Libra FPSO with a Vertical Sump Pump Capable of Withstanding Heavy Seas

    25.04.2016 -

    Amarinth, a leading company specialising in the design, application and manufacture of centrifugal pumps and associated equipment to the Oil & Gas, petrochemical, chemical, industrial and power markets, has secured an order from London Marine Consultants on a very short 14 week lead for a vertical sump pump that will mounted on the bow of the FPSO Pioneiro de Libra and is IP66 rated to protect against heavy seas washing over it.

    Read more

    Weltec Biopower UK Reports Two New Contracts

    22.04.2016 -

    In view of the ongoing debate about a new feed-in tariff (FIT) system, the development of renewable energies in the UK is becoming ever more challenging. Thus, most anaerobic digestion plants are currently implemented by experienced companies. After all, quick planning and construction are a must in order to benefit from the calculated FIT. Against this backdrop, the plant manufacturer Weltec Biopower UK Ltd. from Stoneleigh, Warwickshire, has reported the placement of orders for two new agricultural biogas plant projects in England and Northern Ireland.

    Read more