IN FOCUS

Whitepaper: Select the Right Pump before Errors Get Costly

Whitepaper: Select the Right Pump before Errors Get Costly

Seven pump selection errors that stay invisible at quote time – from NPSH margins to viscosity correction. The free VSX whitepaper “Best Practices for Avoiding Hydraulic Pump Selection Errors” shows engineering and sales teams how to spot them early, what they cost and which standards apply. Includes an 8-point pre-selection checklist.

How a Diaphragm Pump Works

How a Diaphragm Pump Works

Double diaphragm pumps operate using an oscillating positive displacement principle. The pump consists of two main fluid housings and a central air control section. Inside each housing, a flexible diaphragm is mounted vertically and connected to a shared shaft. As compressed air enters and exits the air chambers, the diaphragms move in a coordinated push pull motion.

LATEST NEWS

Trelleborg Makes Step Change in High-Pressure Radial Shaft Seals with New Stefa Portfolio

05.12.2024 -

Trelleborg Sealing Solutions, a specialist in sealing technology, announces the launch of the innovative Stefa high-pressure radial shaft seal portfolio designed to deliver unmatched performance across a wide variety of demanding applications. Stefa high-pressure radial shaft seals (HPRSS) are optimized to improve sealing performance for various speed, chemical compatibility and pressure challenges. They also feature innovative engineered designs that compensate for shaft misalignment, ensuring reliable sealing under extreme conditions.

SIMFLO and SitePro Bring Industry-Changing Technology to New Pump Testing Facility

05.12.2024 -

Lubbock-based SIMFLO, one of the nation’s providers of industrial, municipal, and commercial and agricultural-use pumps, has added industry-changing, first-of-its-kind innovative technology to its new Engineered Products Facility, which features one of the largest and most advanced vertical turbine test facilities in North America. The technology, provided by Lubbock-based SitePro, Inc., allows SIMFLO to enable remote witness testing from anywhere in the world, thus saving customers and engineering firms significant time, expense, and resources.

Seawater Lift Pumps Delivered in Record Time

04.12.2024 -

In the competitive world of supplying equipment to offshore platforms, Sulzer has succeeded in delivering another contract for seawater lift and water injection pumps. Streamlined processes have enabled the delivery time to be cut by almost 25% compared to industry expectations, saving precious project time and securing important contracts for two manufacturing sites.

Razorleaf Corporation Unveils the Next Generation of CLOVER

04.12.2024 -

Razorleaf Corporation, specialized in digital engineering, manufacturing consulting, and systems integration, has introduced the next generation of CLOVER, its powerful digital thread integration platform. Designed to help manufacturing organizations construct a scalable digital thread across the entire product lifecycle, CLOVER, in many cases, eliminates the need for professional services for installation, implementation, and maintenance, reducing the cost and risk associated with integration platforms.

Registration Now Open for Europump’s Annual Meeting

03.12.2024 -

Europump (the European Pump Association) is delighted to announce that online registration for its highly anticipated 2025 Annual Meeting and General Assembly is now open. Hosted by the Czech Pump Manufacturers Association (CPMA), this prestigious three-day event will be held from May 21st to 23rd, 2025, at the Hilton Hotel in the historic and picturesque city of Prague.

Weir Wins Order to Supply North America’s Largest Mill Pump

03.12.2024 -

The Weir Group PLC (Weir) has been awarded contracts to supply WARMAN slurry pumps and CAVEX hydrocyclones to Teck’s Highland Valley Copper (HVC) Mine Life Extension (MLE) project in Canada. Teck’s Highland Valley Copper Mine Life Extension Project aims to extend the mine’s operational life by enhancing existing site infrastructure, addressing the growing demand for copper driven by the transition to a low-carbon future. The project is expected to yield approximately 1.95 million tons of additional copper over its lifespan.