New Settlement Tank now Prepared for Handy Water Meter

05.04.2022
BBA Pumps introduces a new settlement tank for mobile pumping systems and wellpoint dewatering. The settlement tank is now prepared for the installation of a Handy water meter and is equipped as standard with a composite grating cover and logo panels for own branding.
New Settlement Tank now Prepared for Handy Water Meter

New settlement tank now prepared for Handy water meter. (Image source: BBA Pumps BV)

In many countries it is mandatory to place a settlement tank in the discharge pipe of a pump system. This allows the particles to settle before the water is discharged through the sewer or into a river. The BBA Pumps settlement tanks were already equipped with useful features such as their ability to be stacked with mobile pumps, forklift pockets and a removable partition for easy cleaning.

Measuring is knowing
Because the fluid is completely de-aerated when it leaves the settlement tank, you get a very accurate flow measurement. The Handy water meter option offers the user multiple advantages such as safety, convenience and a reliable measurement of the amount of fluid to be pumped.

More articles on this topic

Critical Dewatering Operations Ensure On-Time Delivery of Bridge Construction Project in the Philippines

09.07.2024 -

Atlas Copco’s footprint and expertise have improved critical dewatering operations on a strategic infrastructure project in The Philippines. The Dipolog-Dapitan bridge project is one of several development initiatives on the island of Mindanao, intended to boost economic growth in the region. Despite high levels of rainfall, safe working conditions have been maintained and the project has been kept on schedule through the deployment of Atlas Copco dewatering pumps.

Read more