HMS Group and Novatek Sign Memorandum on Localization of LNG Equipment

28.10.2019
HMS Group recently announces that the company and PAO NOVATEK (“NOVATEK”) (the “Parties”) signed a Memorandum on strategic partnership, which aims the further development of mutual cooperation in a field of design and manufacture of first-of-its-kind-in-Russia equipment for LNG projects.

The Memorandum sets the general principles and main directions of mutually beneficial cooperation. It composes the long-term intention of the Parties to pursue a wide-scale cooperation to localize the manufacturing of compressors, pumps and other equipment for NOVATEK’s LNG projects.

Taking into account a successful experience of cooperation between HMS Group and NOVATEK on design and manufacture of the key compressor-based equipment under the “Arctic cascade” technology (home-grown technology of natural-gas liquefaction, which was developed by NOVATEK), the Parties fixed their mutual interest in cooperative development of new types of high-performance equipment for natural-gas liquefaction as well as further localization of equipment for large-capacity LNG projects and their raw-material base.

Prioritized directions of cooperation, fixed in the Memorandum, comprise design, manufacture and testing of hi-tech pumping and compressor equipment, including submersible cryogenic LNG-unloading pumps, as well as column, heat-exchanging and vessel equipment for natural-gas treatment and liquefaction units.

Source: HMS Group

More articles on this topic

Elliott Group to Supply Equipment for the Port Arthur LNG Phase 1 Project

22.08.2023 -

Elliott Group, a wholly owned subsidiary of EBARA CORPORATION, announced that it has won an order to supply cryogenic rotating equipment for the Port Arthur LNG Phase 1 project in Jefferson County, Texas. Elliott will supply cryogenic pumps, expanders, boil-off gas (BOG) compressors, and end flash gas (EFG) compressors for the project, which is being developed by Sempra Infrastructure.

Read more