GEA Breaks Ground on New U.S. Facility in Janesville, Wisconsin

17.11.2022
GEA marked the official start of construction of its new repair, logistics, assembly, production and training facility in Janesville, Wisconsin (USA).
GEA Breaks Ground on New U.S. Facility in Janesville, Wisconsin

GEA breaks ground on new U.S. facility. The ground-breaking ceremony, which took place last week, was attended by GEA representatives (from left to right): Peter Doran (Senior VP Corporate Real Estate), Evan Walker (Senior Director Sales Administration/Operations Homogenizers) and Michael J Vick (VP Representative Separation & Flow Technology Division NAM)

The company will invest about 20 million USD in the new site in response to growing demand for separators, decanters, valves, pumps and homogenizers which are at the heart of many industrial production processes. The 85,000 square foot-building is scheduled for completion in late 2023. In addition to modern office space, the facility will house a training center for customers and employees. The remaining space will be used for the repair of mechanical equipment and logistics. Located approximately 80 miles west of Milwaukee and 40 miles south of Madison, the new GEA facility will create more than 70 jobs.

“The Janesville facility will bring us closer to our growing Midwest customer base and it will enable us to meet the growing demand for our products,” says Azam Owaisi, CEO GEA North America. “As the new facility will have production capabilities to finalize separator, decanter, valve and pump assembly, GEA will fully meet the ‘Built in America’ mandates if required. We would like to thank the city of Janesville leadership for their cooperation and support.”

Separators are machines used to separate two liquids of different densities from each other. Particularly in the pharmaceutical, dairy, food and marine industries separators are essential. Decanters contribute to a cleaner environment in numerous industrial applications such as wastewater and water treatment. Valves and Pumps are controlled flow technology equipment while homogenizers are a type of mixing equipment to create a uniform and consistent mixture.

Emphasis on sustainability
GEA has set itself ambitious sustainability goals. Next to its net zero ambition for 2040, GEA also aims to be the employer of choice in the industry.

The new facility will therefore feature numerous measures to make it a net-zero facility. These measures include a high efficiency heating and cooling system, solar panels, LED lighting, electric car charging stations, recycling and water reuse possibilities.

In addition, GEA is working with Blackhawk Technical College in Janesville to develop an educational and training program. This will provide GEA with a pool of graduates with the desired skillset to meet the current and future workforce needs.

More articles on this topic

Wilo Welcomes the Management of the Wisconsin Economic Development Corporation in Dortmund

03.05.2024 -

With the aim of strengthening business networks in the state of Wisconsin, Wilo CEO Oliver Hermes welcomed Melissa “Missy” Hughes, Secretary and CEO, and Katy Sinnott, Vice President Global Trade and Investment of the Wisconsin Economic Development Corporation (WEDC) to Wilo’s headquarters in Dortmund. The two Americans were accompanied by Stefan Peikert, Head of the European Office of the WEDC in Berlin.

Read more