Significant Increase in Major Orders for GEA in Second Quarter

23.08.2017

In the second quarter of the year, GEA recorded significant year-on-year growth in major orders (volumes exceeding EUR 15 million) in the fields of e.g. dairy, beverage, and coffee projects.

Whereas in the same quarter of the previous year, the company posted only two major orders worth a total of EUR 46 million, the second quarter of 2017 saw GEA almost triple its volume of incoming orders to around EUR 136 million. As such, growth in major orders was above-average.

For example, GEA supplied a complete milk powder processing facility to Open Country Dairy in New Zealand, with the total value of this project running to more than EUR 10 million. This is the sixth dairy processing facility GEA has shipped to Open Country Dairy at four different locations since 2007. Each of these facilities is capable of processing eight tonnes of milk powder an hour. In the case of the recent order, however, the customer specified a MAP system (Modified Atmosphere Packing) for the first time in order to minimize the residual oxygen content (RO) in the 25-kg bags produced. This ensures that the product retains its high quality during transport to the key markets of China and the Middle East. Open Country Dairy is the second biggest exporter of premium whole-milk powders in the world. The new facility will be commissioned in September 2018.

"We focus on delivering cutting-edge technology to deal with challenging production methods, while always providing maximum customer satisfaction - this is the basis for long-standing partnerships of the kind we enjoy with key customers such as Open Country Dairy," said Jürg Oleas, CEO of GEA.

More articles on this topic

DMT and MUTAG Combine Competences

22.03.2022 -

The age of “survival of the fittest” is over – the future will be won by companies that cooperate with each other, according to the trend monitor of the German Future Institute. The international engineering and consulting company DMT GmbH und Co. KG has been working on this since 1737, enabling joint progress in complex engineering assignments across the world.

Read more

Endress+Hauser Hoists the Flag on the Gulf Coast

02.11.2021 -

Endress+Hauser has invested 34 million U.S. dollars in a modern campus in Pearland, Texas in the Houston metropolitan area. The 112,000-square-meter campus includes a large new training center, office space for 125 employees, a calibration lab and a repair facility. The new campus reinforces the Group’s presence in the Gulf Coast region of the USA.

Read more

ACHEMA 2022: The World Forum for the Process Industries on Site in Frankfurt Again

15.10.2021 -

After ACHEMA Pulse 2021 – the pioneering digital event for the process industry – ACHEMA 2022 is back in Frankfurt: from 4 to 8 April 2022, the Frankfurt Fairground will once again be the meeting place for the global process industries. In times of a pandemic, a comprehensive hygiene concept ensures that personal exchange and networking are once again possible in safety on site.

Read more