Organizational Changes at Baker Hughes

06.12.2005

Baker Hughes Incorporated announced that William P. "Wil" Faubel will be appointed President of Baker Atlas beginning January 1, 2006, succeeding David H. Barr who was acting as interim president of Baker Atlas since August 2005.

Mr. Faubel will report directly to Mr. Barr, Group President, Drilling and Evaluation. The company also announced that Charles S. "Charlie" Wolley will be appointed President of Centrilift beginning January 1, 2006, succeeding Mr. Faubel. Mr. Wolley will report directly to Douglas J. Wall, Group President, Completions and Production.

James R. "Rod" Clark, Baker Hughes President and Chief Operating Officer, said, "I am pleased to announce the appointment of Wil Faubel as President of Baker Atlas and welcome Charlie Wolley as the new President of Centrilift. Both Wil and Charlie bring strong leadership skills and proven track records of success and promoting our Core Values to their new positions. Under Wil's leadership Centrilift posted record financial performance levels in four of the five years of his tenure. Charlie Wolley has been instrumental in furthering the technology success of Hughes Christensen."

Biographies

William P. "Wil" Faubel (50) is currently President of Centrilift, a position he has held since May 2001. Mr. Faubel joined Baker Hughes as a field engineer for Hughes Christensen in 1977. Since then he has held a variety of sales and management positions in both domestic and international regions, including Vice President of Marketing for Hughes Christensen. He received his Bachelor of Science Degree in Mechanical Engineering from Southern Methodist University.

Charles S. "Charlie" Wolley (51) is currently Vice President of Manufacturing and Technology at Hughes Christensen. Mr. Wolley joined Baker Hughes in 2004 after 27 years of experience with Dresser Valve and Control, Van Leeuwen Pipe and Tube Corporation, Leslie Controls, Spence Engineering, and Watts Industries where he held a variety of senior leadership positions, including Manufacturing Engineering Manager, Vice President of Manufacturing and President. He received his Bachelor of Science degree in Operational Research and an Industrial Engineering degree from Cornell University.

More articles on this topic

Sulzer Pump Retrofit Secures Flare Knockout Pump Reliability

21.11.2023 -

To ensure the profitability of offshore oil and gas extraction, operators require equipment to perform reliably throughout long periods between maintenance intervals. When an international oil company (IOC) was experiencing short mean time between failures (MTBF) for its liquified petroleum flare knockout vessel pumps on an offshore platform in Malaysia, the business approached Sulzer for a pump retrofit to safeguard uptime.

Read more

Amarinth Overhauls Safety Critical Oil Containment Skid Packages

13.07.2023 -

Amarinth has been contracted by Wood to overhaul the three oil containment skid packages managed and operated by Oil Spill Response Limited. Six years ago, Amarinth supplied ten API 610 OH1 pumps with Plan 53B Seal Support systems to the Subsea Well Response Project for a global containment toolkit that can support subsea well incident response if well shut-in is not immediately possible.

Read more

Amarinth Signs PE Energy as West African Agent and Approved Certified Service Provider

02.06.2023 -

Amarinth has signed PE Energy Ltd, based in Nigeria, as a West African agent and Approved Certified Service Provider. PE Energy Ltd is one of the most trusted and sought-after partners in the West African oil and gas industry with a team of internationally trained experts delivering solutions and application engineering expertise in upstream, midstream, and downstream processes.

Read more