Clydeunion Pumps Wins Kindasa Desalination Plant Expansion Contract

17.11.2011

Clydeunion Pumps has been awarded a contract by Kindasa Water Services to supply pumps for an additional train for the existing Kindasa SWRO desalination plant in Saudi Arabia.

Under the contract, Clydeunion Pumps will manufacture in their Glasgow facility a 1st Pass HP pump (BB3 380B FH x 4 stage), a HP Booster pump (CP 1A 60), a 2nd Pass HP pump (Uniglide SDCH150/200) and a Sea Water Intake pump (VTP SBWM560F), all provided in Super Duplex. Clydeunion Pumps success in supplying the well proven BB3 High Pressure frames will be coupled with the collaboration with a key industry player providing power recovery pelton turbines.

The Kindasa contract increases the current Clydeunion Pumps unit population at site with this full additional train for the SWRO plant. John Fleming, Managing Director of the Water & Industrial Business Unit at Clydeunion Pumps, said “The award of the Kindasa expansion contract for the additional pumps is a welcomed acknowledgment of our equipment operational performance and reliability over the seven years of operation with the existing plant”.

More articles on this topic

SAER Pumps now Available in Super Duplex

13.05.2022 -

Climate change, demographic growth and water scarcity are creating new challenges, and desalination is becoming a crucial alternative to traditional fresh water resources. SAER is ready to face these new scenarios with a strong and effective response: a full range available in duplex and super duplex.

Read more