|
29.07.2002 Successful Clean Up at IMI Yorkshire Fittings with VERDERFLEX |
||||||||
Enormous time and cost-savings on site after installation of a VERDERFLEX VF 25 peristaltic hose pump. IMF, who manufacture copper fittings and valves which cover a variety of jointing techniques and applications for plumbing and heating, needed a more reliable pump to remove waste floor washings, through copper piping, to a waste tank which would then be taken from site. Waste floor washings are very dirty and sludgy and this led to the seals and balls of the AOD becoming blocked. Due to this, almost every other day the pump had to be stopped and taken apart in order for it to be cleaned. This process would take at least half an hour – costing the company a great amount overall in terms of lost time and labour costs. Picture: (source: Verder) Verder |
| |||||||
| [ Home ] [ Pump Magazine ] [ Virtual exhibition ] [ Encyclopedia ] [ PumpSelector ] [ Impressum ] |