Aker Wirth Deliveres 300th Mud Pump TPK 2200
30.01.2013 -
The 300th mud pump in the TPK 2200 series successfully completed its trial run on the 6 and 7 November 2012 after it was put through its paces in a rigorous 48 hour endurance test.